X

论文代写:步行桥

thesis代写

论文代写:步行桥

这条公路是英国最繁忙的公路之一。在繁忙的公路上,每天有行人过马路。这座桥将持续很长一段时间,因此,在施工过程中,行人和交通将面临许多问题。因为有两个主要道路及两侧:“新英格兰公路’连接’梅特兰,又把新城堡地区。有了这座桥,行人就能很容易地穿过马路了。在公路的温度没有9是最佳的,因此不会有任何问题的桥梁建设。由两边的公路组成的公路的宽度是非常大的,因此,这座步行桥,这里的人群是必不可少的,以减少交通干扰。持续的交通将是最大的问题,是英国最繁忙的路线,它也连接了英国的重要城市太。
这座桥将是一个福音的人要么生活在那里或来购物,因为它会使交通更方便和安全。这座桥是最好的选择,经济上,但不是唯一的选择。也可以建造一个地下通在这条公路上,这也有利于行人穿越公路。将有一个有效的地下道建设的问题,是沉重的交通在道路上,缺乏空间。在成本估算方面,地下通道的成本将远远高于步行桥的道路,因为额外的成本,挖掘地面,额外的支柱,然后建设进入和退出网关。成本和时间都会减少,如果行人步行桥,而不是地下通。脚桥的高度超过3米,它有五个独立的车道,顶部的区域被用于广告。

论文代写:步行桥

This highway is one of the busiest highways in the England. Being busy highway, numbers of pedestrians crosses the road on daily basis. This bridge will continue for long time, therefore, the pedestrians and the traffic will face lots of issues during the construction. Since there are two main roads as well on both sides: the ‘The New England Highway’ which connects ‘Maitland’, and also connects the New Castle area too. With this bridge, the pedestrians will be able to cross the roads easily. The temperature at Highway No 9 is optimum therefore there will not be any issue to the construction for the bridge. The width of the highway consisting of the two side roads is very big; therefore this foot bridge for crossing the crowd here is essential to reduce the traffic disturbance. The ongoing traffic will be the biggest problem as being the busiest route in England and it also connects the important cities in England too.

This bridge will be a boon for the people either living there or coming for shopping, because it will make the transportation easier and safe. This foot bridge is the best option economically but not the only option. There can also be constructed an underground pass on this highway which is also beneficial for the pedestrians to cross the highway. There will be issue of efficient construction of the underground pass as being the heavy traffic over the road, and lack of space. In terms of cost estimation, the underground pass cost will be much higher than the pedestrian foot bridge over the road because of extra cost for digging the ground, extra pillars and then construct the entry and exit gateways. The cost and time both will reduce if the pedestrian foot bridge is constructed instead of the underground pass. The height of the foot bridge is more than 3 meters and it has five separate lanes on bottom and the top area is used for the advertising.