在这个模型中,管理承包商不是雇来做任何任务,但被雇佣来管理流程的运作效率。这些作品是由承包商工作sub-coordination直接受雇于合同经理。工作或交易的条款和条件是通过客户端之前的包和sub-coordination工作。管理承包商负责项目的管理和操作。

设计和构造:设计和构造是一个项目交付系统用于民用建筑项目工作。在这个模型中设计和施工工作只由一个实体。只有在这个模型中单点责任。这个模型有助于降低成本和减少风险的项目所有者(Rozhanskaya,玛利亚姆;Levinova i s . 1996)。因此这个阶段重叠设计阶段设计和施工的交货时间表是减少。单点责任,设计和构造方法是好的,有最清晰的合同的补救措施。这是由于承包商将负责所有项目相关的活动和工作。在传统的方法中,有指定的设计师设计活动和施工承包商对所有施工活动使得计划推迟交付(戴维斯,尼古拉·埃尔基Jokiniemi,2008)。

这三种方法的采购通常适用于此类项目。在这个前期建设报告行人陆桥的道路和交通管理局新南威尔士、英国,建议设计和构造的方法是完美的。这是因为作为一个行人陆桥没有用户将支付桥的用法。因此,所有的投资只做形式的政府。

论文代写:道路和交通管理局新南威尔士
Abstract
In this model, the management contractor is not hired to do any task but is hired for managing the process efficiently and effectively. These works are sub-coordination by the work contractors who are directly employed by the contract manager. The terms and conditions of works or trades are approved by the client before the packages and sub-coordination at the work. The management contractor is responsible for administration and operation of the project.
Design and Construct: Design and Construct is a project delivery system used in the civil construction project work. In this model both design and construction work is done by one entity only. There is only single point of responsibility in this model. This model helps in reducing the costs and minimizing the risk for the project owner (Rozhanskaya, Mariam; and Levinova, I. S. 1996). This phase overlaps the design phase therefore the schedule of delivery for both design and construction is reduced. With its single point responsibility, the design and construct method is good and carries the clearest contractual remedies. This is because the contractor will be responsible for all the project related activities and works. In traditional approach, there is appointed designer for all design activities and construction contractor for all construction activities which makes delay in the scheduled delivery (Davies, Nikolas, and Erkki Jokiniemi, 2008).
These three methods of procurement are generally applicable for such projects. In this pre-construction report of pedestrian foot bridge by roads and traffic authority of NSW, United Kingdom, it is recommended that ‘Design and Construct’ method is perfect. This is because being a pedestrian foot bridge no users will pay for the usages of the bridge. Therefore, all the investments will be done form the government only.