美国论文数据库:投标书

美国论文数据库:投标书

黄是马来西亚一位成功商人的儿子,目前在他父母的公司工作。黄在墨尔本拥有一处房产。已经开发的宅基地面积非常大,黄决定在宅基地的尾部建设一个小型的厂房和工厂。黄向一家制造公司提交了一份投标书,内容是组装和制造零部件供组织使用,其主要意图是使用车间和工厂来存放他在生产过程中需要的设备和机械。目前已经接受这个趋势,需要在11月1日前完成车间和车库。提供已提交投标书的部件必须满足这一最后期限。黄接触了一个注册的建筑商,Bill,并和他讨论了关于他的关键要求,即按照完工日期严格地为11月1日建造车间和车库。但是他并没有和Bill沟通这些数据对Huang的意义。

美国论文数据库:投标书
Bill认为Huang将会使用这个workshop和工厂,所以需要在11月1日前完成建设。由于Bill的拖延,该建筑没有按照规定的最后期限按时完工,而Huang也面临着损失,因为他失去了提供部件的投标。不可否认的事实是,损失的发生是由于Bill在按时建造车间和车库的过程中没有表现。由于Bill的延期合同给Huang造成了15万美元的损失。黄正在考虑起诉Bill违约,并要求Bill赔偿15万美元,因为Bill违约造成的损失。合同是指订立某种形式的协议的双方为履行某种特定的义务而订立的。在法律术语中,一方当事人不履行任何合同义务被称为违约。由于高度依赖于具体情况,当一方未能按时履行义务时,就可能发生违约。

美国论文数据库:投标书

Huang is the son of a successful businessman of Malaysia and has been currently working at the company of his parents. Huang has an ownership of a home in Melbourne. The land allotted over which there has been a development of the house is extremely large, and Huang takes the decision of constructing a small size workshop and factory at the rear ends of the land allotted. Huang made submissions of a tender to a company of manufacturing for assembling and making components for organization, and the key intension is of using the workshop and the factory for housing the equipment and machinery required that he will require during the process. There has been an acceptance of the tendency and currently, and there is a need for completing the workshop and garage by the 1st of November. This deadline has to be met for supplying the components for which there has been a submission of tender. Huang comes in contact with a registered builder, Bill, and has a discussion with him regarding his key requirement to construct the workshop and garage as per the date of completion to be strict for 1st November. However, he did not communicate with Bill regarding the significance of the data for Huang.

美国论文数据库:投标书
Bill holds the assumption that Huang will use the workshop and the factory for Huang, and hence require completion of construction by 1st November. Because of the delays from Bill, the building is not constructed on time as per the deadline fixed, and Huang faces a loss as he loses the tender for supplying the components. There is no denial in the fact that the loss took place due to non-performance from Bill in constructing the workshop and the garage on time. This delay of contract from Bill therefore leads towards the loss of 150,000 dollars for Huang. Huang is considering to sue Bill for breaching the contract and is also claiming the amount of 150,000 dollars from Bill as the loss took place due to the breach of contract by Bill. A contract is said to be creating specific obligations for being fulfilled by the parties who enter into some form of agreement. In legal terms, the failure of one party in fulfilling any kind of contractual obligation is referred to as a contract breach. Being highly dependent on the specifics, there can be occurrence of breach when a party ends up failing in delivering on time performance.